UCTE-IPS/UPS Interconnection: Wind Energy Emergency Control Issues

This document was uploaded by one of our users. The uploader already confirmed that they had the permission to publish it. If you are author/publisher or own the copyright of this documents, please report to us by using this DMCA report form.

Simply click on the Download Book button.

Yes, Book downloads on Ebookily are 100% Free.

Sometimes the book is free on Amazon As well, so go ahead and hit "Search on Amazon"

CMTEE 2010
A. Arestova, A. Grobovoy
Abstract
This paper concentrates on the possible directions of examination in the frame of one of the projects fulfilled under FP7 program umbrella. In 2009 the project Intelligent Coordination of Operation and Emergency Control of European Union and Russian Power Grids has been started to develop the prototype of the large power system SCADA/EMS. The project could become the basis for development of the main principles for the control system of possible UCTE-IPS/UPS interconnection that could be occurring in the near future. The paper ascertains the potential of attracting both back-to-back converter stations and wind power plants to increase the efficiency of functioning of the power system emergency control structure. The possible ways of improving of UCTE-IPS/UPS interconnection with the use of the recently obtained results of the UCTE-IPS/UPS feasibility study are discussed.

Language: English
Commentary: 1049934
Tags: Топливно-энергетический комплекс;Электрические системы и сети