Строительное право. Протокол о задержке и прерывании.
United Kingdom, 2002 (Reprint 2004), 85 pags., Text in English.
The content of the book is:
Introduction.
Core Principles Related to Delay and Compensation.
Guidance Notes.
Guidance Section 1: Guidelines on the Protocol's Position on Core Principles and on other Matters Relating to Delay and Compensation.
Guidance Section 2: Guidelines on Preparing and Maintaining Programmes and Records.
Guidance Section 3: Guidelines on Dealing with Extensions of Time During the Course of the Project.
Guidance Section 4: Guidelines on Dealing with Disputed Extension of Time Issues after Completion of the Project. Retrospective Delay Analysis.
Appendices.
Appendix A: Definitions and Glossary.
Appendix B: Model Specification Clause.
Appendix C: Model Record Clauses.
Appendix D: Graphics Illustrating Points in this Protocol.
This Protocol is used in International Contracts in claims on Extension of Time (EOT) and the Additional Costs related with them.
It is also in the negotiation of the Particular Conditions in international engineering and construction contracts in order to get a balanced share of risks between the parties.
This is (until 2012) the last edition of the Protocol (2002, Reprint of 2004) issued by the Society of Law Construction.