At site and service exrerience verification of the pincipally new turbogenerator type-asynchronized air cooled one

This document was uploaded by one of our users. The uploader already confirmed that they had the permission to publish it. If you are author/publisher or own the copyright of this documents, please report to us by using this DMCA report form.

Simply click on the Download Book button.

Yes, Book downloads on Ebookily are 100% Free.

Sometimes the book is free on Amazon As well, so go ahead and hit "Search on Amazon"

I.Y. Dovganjuk
I.A. Labunets
L. G. Mamikonyants
Vniie
V.E. Zinakov
E.V. Chernishov
MosEnergo
L.A. Kadi-Ogli
N.D. Pinchuk
Electrosila Plant
The air cooled 110 MW synchronized (two axis excited) two pole turbogenerator T3FA-110 type has been described briefly in the CIGRE Session 2004 paper A1-
103. The prototype of this machine has been put in operation in the one of Moscow thermal power plants in 2003 December. Additionally to the standard testings carried out earlier (in the manufactures test-bed and in this power plant before commissioning) the machine has been specially tested at site to verify its correspondence to the specific for asynchronized ma-chine requirements – namely the possibility to consume large amount of reactive power and to operate at the reserve conditions synchronously or asynchronously in the cases of exciter failures or abnormal conditions.

Author(s): Dovganjuk I.Y.

Language: English
Commentary: 615303
Tags: Топливно-энергетический комплекс;Электрические станции и подстанции