Advances in Civil Engineering and Environmental Engineering, Volume 1

This document was uploaded by one of our users. The uploader already confirmed that they had the permission to publish it. If you are author/publisher or own the copyright of this documents, please report to us by using this DMCA report form.

Simply click on the Download Book button.

Yes, Book downloads on Ebookily are 100% Free.

Sometimes the book is free on Amazon As well, so go ahead and hit "Search on Amazon"

Advances in Civil Engineering and Environmental Engineering focuses on the research of civil engineering and environmental engineering. the proceedings feature the most cutting-edge research directions and achievements related to civil engineering and environmental. Subjects in the proceedings include Civil engineering technology Civil engineering surveying Geological engineering Structural engineering Tunnel and bridge engineering Environmental protection materials Pollution control project Building environment and equipment engineering The works of this proceedings can promote development of civil engineering and environmental engineering, resource sharing, flexibility and high efficiency. Thereby, promote scientific information interchange between scholars from the top universities, research centers and high-tech enterprises working all around the world.

Author(s): Wira Jazair bin Yahya, Zawawi Bin Daud
Publisher: CRC Press/Balkema
Year: 2023

Language: English
Pages: 524
City: London

Cover
Title Page
Copyright
Table of contents
Preface
Committee members
Research on civil engineering materials and building’s performance
Research on heating of light steel and wood structure house with biomass hot air furnace
1 INTRODUCTION
2 HEATING METHOD AND BIOMASS HOT AIR FURNACE OF SINGLE HOUSE
3 HOT AIR HEATING SYSTEM
4 ADVANTAGES AND DISADVANTAGES OF HOT AIR HEATING SYSTEM OFBIOMASS HOT AIR FURNACE
5 ECONOMIC COMPARISON OF THE TWO HEATING SYSTEMS
6 CONCLUSIONS
ACKNOWLEDGMENT
REFERENCES
Rain erosion characteristics of multi-stage loess high slope of highway1
1 INTRODUCTION
2 MATERIALS AND METHODS
3 RESULTS AND DISCUSSION
4 CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Effect of organic LDHs on rheological properties of different bitumen undergoing UV aging
1 INTRODUCTION
2 MATERIALS AND METHODS
3 RESULTS AND DISCUSSION
4 CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Variation law for aggregate physical stability of latosol particles in banana field
1 INTRODUCTION
2 MATERIALS AND METHODS
3 RESULTS AND DISCUSSION
4 CONCLUSION
ACKNOWLEDGMENTS
REFERENCES
Theoretical investigation on mechanical properties of film-bag sand cofferdam
1 INTRODUCTION
2 GETTING STARTED STRENGTHENING MECHANISM OF FILM-BAG SAND
3 THEORETICAL DERIVATION OF ULTIMATE BEARING CAPACITY OFFILM-BAG SAND
4 CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Study on the application of permeable pavement materials in road rehabilitation
1 INTRODUCTION
2 ANALYSIS OF THE APPLICATION OF PERMEABLE ASPHALT MIXES IN ROADRECONSTRUCTION
3 ANALYSIS OF THE APPLICATION OF PERMEABLE CEMENT CONCRETEIN ROAD RENOVATION
4 EXAMPLE ANALYSIS OF ROAD IMPROVEMENTS
5 CONCLUSION
REFERENCES
Fire protection design of external walls during the renovation of old residential areas
1 INTRODUCTION
2 THE NUMERICAL MODEL
3 FIRE SIMULATION AND RESULT ANALYSIS
4 CONCLUSION
REFERENCES
Discussion on problems in environmental management in the whole-process highway construction under new circumstances and the cou
1 INTRODUCTION
2 CONCEPT OF ENVIRONMENTAL MANAGEMENT IN THE WHOLE-PROCESSHIGHWAY CONSTRUCTION
3 ANALYSIS OF PROBLEMS OF ENVIRONMENTAL MANAGEMENT INWHOLE-PROCESS HIGHWAY CONSTRUCTION PROJECTS UNDER NEWCIRCUMSTANCES
4 STRATEGIES AND SUGGESTIONS FOR IMPROVING THE EFFECTIVENESS OFWHOLE-PROCESS ENVIRONMENTAL MANAGEMENT
5 CONCLUSION
ACKNOWLEDGMENTS
REFERENCES
Analysis of the advance of flood control project in Jingjiang with satellite earth observation and remote sensing
1 INTRODUCTION
2 METHODOLOGY
3 OVERVIEW OF JINGJIANG FLOOD CONTROL PROJECT
4 IMPROVEMENTS
5 CONCLUSION
REFERENCES
Model tests on temperature and displacement characteristics of freezing underground engineering in water-rich gravel stratum
1 INTRODUCTION
2 DETERMINATION OF MODEL PARAMETERS
3 DESIGN OF THE MODEL TEST SYSTEM
4 MODEL TEST RESULTS ANALYSIS
5 CONCLUSION
REFERENCES
Research on the evaluation method of the treatment effect of subway shield tunnel crossing karst cave
1 INTRODUCTION
2 PROJECT OVERVIEW
3 ANALYSIS OF THE KARST GROUTING EFFECT
4 CONCLUSION
REFERENCES
Design and application of ventilation and cooling systems for high geotemperature tunnels
1 INTRODUCTION
2 PROJECT OVERVIEW
3 CLIMATIC ANALYSIS OF THE NIGE TUNNEL AREA
4 STUDY ON NIGE TUNNEL REFRIGERATION SYSTEM
5 APPLICATION EFFECT ANALYSIS
6 CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Design and application of prefabricated top air duct in subway station
1 INTRODUCTION
2 ENGINEERING SITUATION
3 FINITE ELEMENT ANALYSIS
4 CONCLUSION
REFERENCES
Challenges faced by landscape architecture in creating information models and reasons behind
1 INTRODUCTION
2 RESEARCH METHOD
3 SUMMARY OF PROBLEMS
4 RESULT ANALYSIS
5 SUGGESTIONS AND CONCLUSIONS
ACKNOWLEDGEMENTS
REFERENCES
Analysis of mechanical properties of cold-formed thin-walled steel wood composite columns
1 INTRODUCTION
2 COLD-FORMED THIN-WALLED STEELWOOD COMPOSITE COLUMN
3 STRESS PERFORMANCE ANALYSIS
4 EXAMPLE CHECKING CALCULATION
5 CONCLUSION
ACKNOWLEDGMENTS
REFERENCES
Spatial analysis of commercial land prices in urban agglomeration using the gravity model
1 INTRODUCTION
2 AN OVERVIEW OF THE STUDY AREA AND DATA SOURCES
3 THE CONSTRUCTION OF THE URBAN LAND PRICE GRAVITY MODEL
4 THE ANALYSIS OF SPATIAL INTERACTION BETWEEN CITIES BASED ON THELAND PRICE GRAVITY MODEL
5 CONCLUSION AND DISCUSSION
REFERENCES
Experimental analysis on corrosion resistance of extruded anchor type recoverable prestressed anchor cable
1 INTRODUCTION
2 WORKING AND RECYCLING PRINCIPLES OF EXTRUDED ANCHOR TYPERECOVERABLE PRESTRESSED ANCHOR CABLE
3 RAW MATERIALS AND TEST SCHEME
4 ANALYSIS OF THE CHANGE OF MECHANICAL PROPERTIES OF CEMENT PASTETEST BLOCK IN COUPLED SALT SOLUTION
5 CORROSION RESISTANCE ANALYSIS OF RECOVERABLE ANCHOR CABLESPECIMEN IN COUPLED SALT SOLUTION
6 CONCLUSION
REFERENCES
Study on the spatial characteristics of Lingtang Hui nationality township, Gaoyou City, Jiangsu Province
1 INTRODUCTION
2 OVERVIEW OF LINGTANG HUI TOWNSHIP
3 ANALYSIS OF THE VILLAGE AND STREET PATTERN OF LINGTANG HUI VILLAGE
4 ANALYSIS OF RESIDENTIAL ARCHITECTURE IN LINGTANG HUI TOWNSHIP
5 CONCLUSION
REFERENCES
Development and engineering application of environment-friendly pavement markings
1 INTRODUCTION
2 LABORATORY PREPARATION OF MARKINGS
3 FILED CONSTRUCTION OF PAVEMENT MARKINGS
4 ANALYSIS OF ENGINEERING APPLICATION EFFECTS
5 CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Application of collaborative design in the maintainable and renewable of prefabricated buildings
1 INTRODUCTION
2 THE CHARACTERISTICS OF COLLABORATIVE DESIGN
3 APPLICATION OF COLLABORATIVE DESIGN IN PREFABRICATED HOUSING
4 APPLICATION METHOD OF COOPERATIVE DESIGN FOR PREFABRICATEDRESIDENCE IN THE MAINTENANCE STAGE
5 CONCLUSIONS
ACKNOWLEDGEMENTS
REFERENCES
Research on influence and control of shield tunnel underpass construction on pile foundation settlement of neighboring buildings
1 INTRODUCTION
2 PROJECT OVERVIEW
3 COMPUTATION AND ANALYSIS
4 REINFORCEMENT MEASURES OF PILE FOUNDATION SOIL UNDER SHIELDTUNNEL
5 ON-SITE CONSTRUCTION MONITORING AND ANALYSIS
6 CONCLUSION
ACKNOWLEDGMENTS
REFERENCES
Analysis on basic mechanical properties of manufactured sand concrete modified by super absorbent polymer
1 INTRODUCTION
2 EXPERIMENT DETAILS
3 TEST RESULTS AND ANALYSIS
4 CONCLUSION
CREDIT AUTHORSHIP CONTRIBUTION STATEMENT
DECLARATION OF COMPETING INTEREST
ACKNOWLEDGEMENT
REFERENCES
Study on the proportion of soil similar materials in a model test of a deep foundation pit adjacent river
1 INTRODUCTION
2 MODEL TEST SIMILARITY THEORY AND SIMILARITY RELATION
3 ORTHOGONAL TEST SCHEME OF SOIL SIMILAR MATERIALS
4 CONCLUSIONS
REFERENCES
Discussion on calculation method of bearing capacity of super-soft soil foundation reinforced by bamboo grid and sand cushion
1 INTRODUCTION
2 CALCULATION OF BEARING CAPACITY OF BAMBOO GRID REINFORCED SUPERSOFT SOIL FOUNDATION
3 COMPARISON OF BEARING CAPACITY RESULTS
4 CONCLUSIONS
REFERENCES
Study on displacement warning standard value of large section highway tunnel extension construction
1 INSTRUCTIONS
2 PROJECT PROFILE
3 TEST OF MECHANICAL PROPERTIES OF SURROUNDING ROCK
4 STUDY ON EARLYWARNING OF RECONSTRUCTION AND EXTENSION OF LARGESECTION TUNNEL
5 CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Study on deformation characteristics of dam rockfill materials in a hydropower station
1 GENERAL INSTRUCTIONS
2 COMPRESSION TEST OF DAM MATERIALS
3 ANALYSIS OF COMPRESSIBILITY OF DAM MATERIALS
4 CONCLUSIONS
REFERENCES
Study on the seismic performance of rusted stirrup concrete columns strengthened with externally wrapped shaped steel
1 INTRODUCTION
2 TEST OVERVIEW
3 TEST RESULTS AND ANALYSIS
4 CONCLUSIONS
ACKNOWLEDGEMENT
REFERENCES
Study on the mechanical characteristics of CRD reconstruction and expansion of oversized four-lane tunnel
1 GENERAL INSTRUCTIONS
2 PROJECT OVERVIEW
3 MODEL BUILDING
4 ANALYSIS OF RESULTS
5 CONCLUSIONS
REFERENCES
Design study on floor structure of large hole cantilever patio
1 INTRODUCTION
2 PLANE STRUCTURE LAYOUT AND CROSS-SECTION CHARACTERISTICS
3 FINITE ELEMENT ANALYSIS OF STRESS PERFORMANCE OF LARGE OPEN FLOORSTRUCTURE
4 CONCLUSIONS
REFERENCES
Preliminary determination and inversion of rock mass parameters of underground cavern of Kaluma hydropower station
1 INTRODUCTION
2 INVERSION OF ROCK MASS PARAMETERS
3 CONCLUSION
REFERENCES
Preparation and application study of aerogel thermal insulation mortar material
1 INTRODUCTION
2 THERMAL INSULATION PRINCIPLE OF AEROGEL THERMAL INSULATIONMORTAR
3 PREPARATION PROCESS OF AEROGEL THERMAL INSULATION MORTAR
4 SUMMARY
REFERENCES
Static mechanical properties and strengthening mechanism of nano carbon fiber modified concrete
1 INTRODUCTION
2 MATERIALS AND METHODS
3 RESULTS & DISCUSSION
4 MECHANISM ANALYSIS
5 CONCLUSION
ACKNOWLEDGMENTS
REFERENCES
A study on interfacial bonding properties between UHPC and ordinary concrete
1 INTRODUCTION
2 TEST
3 ANALYSIS OF MECHANICAL STRENGTH ANDWORKING PERFORMANCE OFUHPC
4 CONCLUSION
ACKNOWLEDGEMENT
REFERENCES
Research on shrinkage rate of UHPC composite cement-based material for bridge expansion joints
1 INTRODUCTION
2 TEST
3 TEST RESULTS AND DISCUSSIONS
4 CONCLUSION
ACKNOWLEDGEMENT
REFERENCES
Research on flying gangue movement character under the different angle
1 INTRODUCTION
2 THE MOVEMENT CHARACTERISTICS OF FLYING GANGUE UNDER THEDIFFERENT MINING HEIGHT
3 FLYING GANGUE MOVEMENT CHARACTER UNDER THE DIFFERENT DIP ANGLE
4 CONCLUSION
ACKNOWLEDGEMENTS
REFERENCES
Engineering survey technology and construction risk assessment
Research on the implementation method of big data management engineering archives
1 INTRODUCTION
2 ARCHIVES MANAGEMENT
3 THE NECESSITY OF FILE MANAGEMENT IN THE ERA OF BIG DATA
5 IMPLEMENT THE MEASURES FOR THE INFORMATION CONSTRUCTION OFPROJECT ARCHIVES MANAGEMENT
6 CONCLUSION
REFERENCES
Risk assessment and identification of wellbore instability before deepwater drilling
1 INTRODUCTION
3 QUANTITATIVE EVALUATION MODEL OF WELLBORE INSTABILITY RISK BEFOREDRILLING
4 CASE ANALYSIS
5 CONCLUSION
ACKNOWLEDGMENT
REFERENCES
Research on social stability risk assessment of major highway projects:
Take Quanzhou-Nanning expressway (G72) Guangxi Guilin to Liuzhou
section reconstruction and expansion project as an example
1 INTRODUCTION
2 MATERIALS AND METHODS
3 RESULTS AND DISCUSSION
4 CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Risk assessment of pilotage process in Guangzhou port based on unascertained measurement model
1 INTRODUCTION
2 RISK ASSESSMENT METHOD
3 THE UNASCERTAINED MEASURE RISK MODEL
4 EXAMPLE APPLICATION
5 CONCLUSIONS
ACKNOWLEDGMENT
REFERENCES
Study on risk assessment of Wupai tunnel engineering of Jingheshan-Nanning Expressway in Liuzhou, Guangxi
1 INTRODUCTION
2 MATERIALS AND METHODS
3 RESULTS AND DISCUSSIONS
4 CONCLUSIONS AND SUGGESTIONS
REFERENCES
Study on comprehensive risk evaluation of subway station
1 INTRODUCTION
2 SAFETY RISK EVALUATION INDEX SYSTEM OF THE SUBWAY STATION
3 CASE APPLICATION
4 CONCLUSION
ACKNOWLEDGMENT
REFERENCES
Research on deformation control technology of tunnel argillaceous surrounding rock
1 INTRODUCTION
2 CONTROL MEASURE OF MUDSTONE FORMATION DEFORMATION
3 MONITORING DATA ANALYSIS
4 CONCLUSION
REFERENCES
Research on automatic segment arrangement technology of shield machine
1 GENERAL INSTRUCTIONS
2 OVERALL PROCESS OF PARAMETERIZATION MODELING
3 APPLICATION INSTANCE
4 CONCLUSIONS
REFERENCES
An experimental study on stress wave detection of damaged wood based on the stickup sensors
1 INTRODUCTION
2 TEST DESIGN
3 TEST RESULTS AND ANALYSIS
4 CONCLUSIONS
REFERENCES
Research on entity relation extraction of the BERT-BiLSTM-CRF
model: The perspective of NIMBY conflict in China
1 INTRODUCTION
2 METHODOLOGY
3 EXPERIMENT AND RESULTS
4 COMPARISON VALIDATION
5 DISCUSSION
6 CONCLUSION
REFERENCES
Evaluation study of olfactory landscape in Hangzhou grand canal Asian Games Park
1 INTRODUCTION
2 OLFACTORY LANDSCAPE
3 METHODS
4 CONSTRUCTION OF OLFACTORY LANDSCAPE EVALUATION MODEL OFHANGZHOU GRAND CANAL ASIAN GAMES PARK
5 RESULTS AND ANALYSIS
6 CONCLUSIONS AND SUGGESTIONS
REFERENCES
Research on municipal engineering construction based on aerial survey data
1 INTRODUCTION
2 DATA AND METHODS
3 TEST RESULTS AND DISCUSSIONS
4 CONCLUSIONS
ACKNOWLEDGEMENT
REFERENCES
The hazard of earthquake and solution directions
1 INTRODUCTION
2 SITE SELECTION OF CONSTRUCTION
3 DESIGN CONSTRUCTION
4 OPERATING MAINTENANCE
5 EMERGENCY PREPAREDNESS
6 FUTURE DIRECTION
7 CONCLUSION
REFERENCES
Compression damage in high-toughness cementitious composites after dry-wet cycles
1 INTRODUCTION
2 TEST PROCEDURE
3 RESULTS AND DISCUSSION
4 CONCLUSIONS
ACKNOWLEDGEMENT
REFERENCES
Study on spatial differentiation of comprehensive development
potential among counties and districts in Lhasa
1 INTRODUCTION
2 STUDY AREA AND MATERIALS
3 METHODOLOGY
4 RESULT
5 DISCUSSION
6 CONCLUSION
REFERENCES
Study on the application of BIM+GIS technology in the resilience transformation of old community
1 INTRODUCTION
2 OVERVIEW OF BIM AND GIS
3 THE CURRENT SITUATION IN OLD COMMUNITIES-AN EXAMPLE FROMADISTRICT IN DAQING
4 APPLICATION OF BIM+GIS TECHNOLOGY IN THE PROCESS OF RESILIENCETRANS FOR MATION OF OLD COMMUNITIES
5 RESULT
ACKNOWLEDGMENTS
REFERENCES
Road detection and grouting effect analysis based on ground penetrating radar
1 INTRODUCTION
2 GPR PAVEMENT DETECTION
3 ANALYSIS OF DETECTION RESULTS
4 CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Ground temperature measurement and geological genesis analysis of Nige high geotemperature tunnel
1 INTRODUCTION
2 PROJECT OVERVIEW
3 RESULT ANALYSIS
4 CONCLUSION
ACKNOWLEDGEMENTS
REFERENCES
Analysis of the effect of dewatering and excavation on adjacent bridge piles in the foundation pit
1 RESEARCH BACKGROUND
2 NUMERICAL ANALYSIS MODEL
3 CALCULATION RESULTS AND ANALYSIS
4 CONCLUSION
REFERENCES
Research on the impact of old neighborhoods’ renovation based on
thermal comfort
1 INSTRUCTIONS
2 RESEARCH OBJECTS AND RESEARCH METHODS
3 ANALYSIS OF ENVI-MET SIMULATION RESULTS
4 SUMMARY AND DISCUSSION
ACKNOWLEDGMENTS
REFERENCES
Study on space design of rural residence in the Hexi Corridor based on sustainable perspective
1 GENERAL INSTRUCTIONS
2 OVERVIEW OF THE HEXI CORRIDOR
3 SPACE DESIGN OF RURAL RESIDENCE
4 SUSTAINABILITY ANALYSIS OF SPACE DESIGN FOR RURAL RESIDENCE
5 CONCLUSIONS
ACKNOWLEDGEMENTS
REFERENCES
Research on the motion of flying gangue and design of protective
device in steeply dipping coal seam
1 INTRODUCTION
2 BASIC PRINCIPLE OF ENERGY TRACKING METHOD
3 3-D MOTION ANALYSIS OF FLYING GANGUE
4 DESIGN OF PROTECTIVE DEVICE FOR FLYING GANGUE
5 CONCLUSION
ACKNOWLEDGEMENTS
REFERENCES
Field test design and parameter optimization of 10MPa-Scale pressure consolidation grouting
1 INTRODUCTION
2 PROJECT CONDITIONS
3 FIELD TEST DESIGN OF 10 MPA-SCALE PRESSURE GROUTING
4 RESULTS AND DISCUSSION
5 CONCLUSION
REFERENCES
Research on mathematical model of tailing soil deformation under
multi-field coupling
1 INTRODUCTION
2 DEFORMATION MECHANISM OF TAILING SOIL UNDER MULTI-FIELD COUPLING
3 MATHEMATICAL MODEL OF TAILING SOIL DEFORMATION UNDER MULTI-FIELDCOUPLING
4 CONCLUSION
REFERENCES
On the multi-field coupling of thermo-hydro-mechanical-vapor in
frozen soil
1 INTRODUCTION
2 CURRENT RESEARCH STATUS OF MULTI-PHYSICAL FIELD COUPLING FOR THE FROZEN SOIL
3 CONCLUSIONS AND OUTLOOK
REFERENCES
Research of three-dimensional imaging sonar technology in the
detection of underwater engineering project
1 INTRODUCTION
2 MAIN BODY
3 CONCLUSION
REFERENCES
Automatic slope disaster monitoring and early warning platform based on Kalman filtering model
1 INTRODUCTION
2 SLOPE DISASTER
3 AUTOMATED MONITORING NETWORK SYSTEM
4 AUTOMATIC MONITORING AND EARLYWARNING PLATFORM
5 KEY TECHNOLOGY—AUTOMATIC MONITORING DATA ANALYSIS AND EARLY WARNING
6 CONCLUSIONS
ACKNOWLEDGMENT
REFERENCES
Determination of calculation parameters of bearing capacity of
super-soft soil composite foundation reinforced by bamboo grid and
sand cushion
1 INSTRUCTIONS
2 CALCULATION PARAMETERS OF BEARING CAPACITY OF BAMBOO GRID REINFORCED SUPER SOFT SOIL FOUNDATION
3 INDOOR MODEL LOAD TEST OF BAMBOO GRID REINFORCED SOFT SOILFOUNDATION
4 CONCLUSION
REFERENCES
Application of storm water management model in overload evaluation
and reconstruction of urban stormwater pipes
1 INTRODUCTION
2 INTRODUCTION TO SWMM MODEL
3 CONSTRUCTION OF SWMM
4 ANALYSIS OF PIPE OVERLOAD EVALUATION
5 PIPE RENOVATION
6 CONCLUSIONS
REFERENCES
Leakage prevention and treatment in water supply and drainage projects
1 INTRODUCTION
THE IMPORTANCE OF LEAKAGE PREVENTION TREATMENT AND PREVENTIONINWATER SUPPLY AND DRAINAGE ENGINEERING
3 CONSTRUCTION TECHNOLOGY OF LEAKAGE PREVENTION TREATMENT ANDPREVENTIVE MEASURES FORWATER SUPPLY AND DRAINAGE ENGINEERING
4 POSITIVE IMPACT ON ENVIRONMENTAL PROTECTION OF LEAKAGEPREVENTION AND TREATMENT FORWATER SUPPLY AND DRAINAGEWORKS
5 DEFICIENCIES IN LEAKAGE PREVENTION TREATMENT AND PREVENTIVEMEASURES FORWATER SUPPLY AND DRAINAGE PROJECTS
6 EFFECTIVE MEASURES TO DEAL WITH AND PREVENT LEAKAGE INWATERSUPPLY AND DRAINAGEWORKS
7 CONCLUSION
REFERENCES
Study on reinforcement measures and the effect of supporting for
foundation pit with expansive soil and disintegration rock geological
1 INTRODUCTION
2 PROJECT PROFILE
3 ANALYSIS OF RESPONSE MEASURES
4 ANALYSIS OF MONITORING RESULTS
5 SUMMARY AND RECOMMENDATIONS
ACKNOWLEDGMENTS
REFERENCES
Numerical simulation study of dam break flood in dayang reservoir
1 INTRODUCTION
2 OVERVIEW OF DAYANG RESERVOIR
3 NUMERICAL MODEL BUILDING
4 CALCULATION AND ANALYSIS RESULTS OF DAM BURST INUNDATION
5 CONCLUSION
REFERENCES
A study on the calculation method of building heat loads
1 INTRODUCTION
2 METHOD
3 CASE CALCULATION
4 DISCUSSION
ACKNOWLEDGEMENTS
REFERENCES
Research on the plan for disaster prevention and rescue of three-pipe
parallel ultra-long high-altitude highway tunnel
1 INTRODUCTION
2 PROJECT OVERVIEW
3 DISASTER PREVENTION AND EVACUATION RESCUE COMMAND PRINCIPLES
4 DISASTER PREVENTION AND RESCUE PLAN
5 CONCLUSION
SUBJECT NUMBER
REFERENCES
Study on water quantity verification method for continuous water intake evaluation of construction projects
1 INTRODUCTION
2 PROPOSAL OF VERIFICATION METHOD FOR CONTINUOUSWATER INTAKEPERMIT
3 CALCULATION PROCESS OF CONTINUING THE VERIFICATION METHOD OFWATER INTAKE PERMISSION
4 CASE ANALYSIS
5 CONCLUSION AND SUGGESTIONS
ACKNOWLEDGMENTS
REFERENCES
Author index